$25
Overall template repository for all major project code and descriptions for MTRN4230
Group / Company name: Mom's Friendly Robot Company
The major project for MTRN4230 is a chance to simulate and implement an industrial robot system. Working in groups, define an application of your choosing that includes at least one robot manipulator and a vision system. Implement this in simulation and include a demonstration using the real UR5e (with a ePick vacuum gripper installed) and camera system. Feel free to bring or make your own props. Examples of tasks previous teams have completed:
Sorting and loading chocolates into boxes
Playing Qwirkle
Building Jenga towers (the vacuum gripper on the new robots is unfortunately too large to do this)
Playing Chinese chess (Xiangchi)
Assembling components of a bull-bar
Personalised engraving / printing of logos on 3D surfaces
How you divide the responsibility for subtasks amongst your group members is at your discretion, having one person responsible for project management is encouraged.
MP-I1: Management report
In MP-I1, each group will create a company and define the organisational structure of that company, and then create a Project Management Plan (PMP) for the major project. Individually you will then reflect on a selection of the PMP. Your demonstrator will act as the Project Sponsor and give you formative feedback on the PMP.
MP-G2 : Requirements document
\ In MP-G2, you will generate the requirements and specifications for the system, including use cases and assessment criteria and present a Work Breakdown Structure (WBS) and detailed schedule to your demonstrator for assessment. Your demonstrator will act as the Project Sponsor and either approve your requirements and specifications or request changes.
MP-I3 : Progress demonstration
In MP-I3, you will demonstrate performance towards the project goals and reflect on these. You will have opportunity to present a variation request to the Project Sponsor if you wish to change your requirements or specifications.
During the final exam period, you will complete a final system demonstration at a mutually convenient time agreed with your demonstrator. This will be completed within a 3 hour timeslot, nominally your lab class time in week 12 or 13. This demonstration will be marked with both individual and group components. If your group's components do not integrate well or fail on the day (it happens!), you should have prepared evidence to show your individual contributions against the assessment criteria you defined in MP-G2. In particular, extensive use of simulation for verification and validation is expected.
MP-I4 : Final system component demonstration
Due during Week 12 or 13 (timeslots to be confirmed with each group)\ In MP-I4, you will demonstrate your contributions to the system against the assessment criteria you defined in MP-G2 and write a reflection on the group's performance.
MP-G5 : Final system demonstration
Due during Week 12 or 13 (timeslots to be confirmed with each group)\ In MP-G5, you will present your solution to the Project Sponsor, demonstrate the overall system performance, report on your validation and verification test results.
Learning outcomes
LO1: Learn a robot environment and put it to use effectively and efficiently on a given task
LO2: Understand robot mechanics and use this knowledge to calculate robot performance
LO3: Implement good safety practices in the use of robots
LO4: Apply and evaluate image processing techniques in robotics
LO5: Apply engineering management and technical tools fluently and systematically