CMIS330-Week 8 SDP Project Solved

You have been asked to lead a software development team to build a system fulfilling the Statement of Need specified in project 1. Your team is employed by a small company. The customer wants a project that balances reasonable development cost, timely delivery, software quality, and functionality.

 In this project, you will develop the tool for planning, managing and controlling all your software development efforts on the B&B project.

 Completing this project will require that you produce a software development plan (SDP) document for the system. An SDP must also develop project reporting and team communication mechanisms.

 SDP Templates
Please develop your SDP using the IEEE Standard for Software Project Management Plans, standard 1058-1998, posted in the Reserved Readings section on the Class Menu. Read page 4 of the standard to review the outline. Follow the outline in Figure 1 but omit the following sections from your SDP: 1.1.4 (budget summary), 1.2, 5.1, 5.2.4, 5.3, 5.5, 6.3, 6.4, all of 7, all of 8, Annexes.  

The assignment
1.                Complete the template as best as you can. Pay special attention to the bulletized points below. Make any reasonable assumptions based on your understanding of the problem that allow you to address as many sections of the SDP template as possible. (Please read the “project descriptions” in the project description section of the syllabus for additional context and information on course projects).

2.                Pay special attention to the following. The bulk of your grade will be decided on how well you address these issues.

•        Project schedule (Timeline): Develop a schedule for the entire project.

•        Project task set: Perform a work breakdown.

•        Risk Management: Assess and rank the project and technical risks on the project. Explain the risk mitigation steps for these identified risks.

•        Software Configuration Management: Includes Software quality assurance and software configuration management (SCM) procedures.

 3.  Hints and suggestions  
•        Project schedule (Timeline): Use the Waterfall or Gantt Chart format but you may choose another format if it communicates equivalent information.

•        Activities/tasks: Organize these according to the software development tasks of; analysis, design, code, and test. Decompose these high-level tasks into at least one additional lower-level sub-task, e.g., o Design Task     

o    Module and Interface Design Sub-task o   Data Design Sub-task

•        Project risks (section 5.4): Identify the risks that will jeopardize the successful completion of the project. You must quantify and rank risks based on their severity. You do this by estimating the

risks cost to the project, typically in dollars, and the probability that the risk will occur, an estimate between 0 and 1. Use the example in the Module Commentary to compute a

"weighted" risk which can be used to compare risks for criticality. For the most critical risk, propose a mitigation strategy, in other words, how to avoid or minimize the consequences if the risk were to occur.

•        Software development process (section 6.1): specify one for your project, i.e., Linear-Sequential (Waterfall) or one of the concurrent/iterative processes. Which process you choose should be reflected in our Project Schedule.

•        Project Duration: Estimate Lines of Code or Function Points. Use these to compute project duration and effort. Project duration should be consistent with the time-line of your Schedule. Knowing project duration and effort permits the computation of staff size, i.e., the number of software engineers required (divide effort by duration to yield staff size). I want to see the computation for effort and staff size in the relevant template Section (section 5.2.3).